Project

Columbia REA Tuttle Lane Power Project

Back to Projects
Riddco's Ditch Witch JT3020 All Terrain directional drill staged at the Columbia REA power project on Tuttle Lane in Burbank, Washington.

Location

Burbank, Washington

Client

Columbia REA

Service

Directional drilling

Project Overview

The project

Riddco's crew installed underground power conduit on Tuttle Lane in Burbank, Washington for Columbia REA. The work supported rural electric infrastructure serving residents in the Walla Walla Valley.

Why directional drilling

Rural power service runs through yards, driveways, and landscaping that homeowners want left intact. Directional drilling routes the conduit underground with no open-cut trenching through finished ground, roadways, or restoration zones.

Equipment deployed

  • Ditch Witch JT3020 All Terrain directional drill
  • Vacuum truck for spoil removal
  • Field crew for conduit placement and site safety

Related

Similar Project

Riddco's Kenworth tender truck with Ditch Witch mud tanker and the drill rig deployed on S. 18th Street during the Pacific Power service upgrade in Union Gap, Washington.

Union Gap, Washington

Pacific Power Service Upgrade in Union Gap

Explore Project
Riddco's Ditch Witch directional drill rig in operation with safety cones staged in front and a support dump truck behind, during the J.P. Morgan Bank Charter Fiber installation in Grandview, Washington.

Grandview, Washington

J.P. Morgan Bank Charter Fiber Installation

Explore Project
Wide view of Riddco's Ditch Witch directional drill rig at work on a forest road at the Tumble Creek power conduit crossing near Roslyn, Washington, with the vacuum truck staged ahead and freshly excavated soil at the drill entry.

Roslyn, Washington

Tumble Creek Power Conduit Crossing

Explore Project